Sign In | Join Free | My lightneasy.org
China QINGDAO GUSITE CONSTRUCTION ENGINEERING CO.,LTD logo
QINGDAO GUSITE CONSTRUCTION ENGINEERING CO.,LTD
AS LONG AS ONE HAS A TRUE FRIEND,HE IS CLOSE EVEN VHEN FAR AWAY
Site Member

3 Years

Home > Steel Structure Warehouse >

Prefab Portal Frame Steel Structure Building For Storage With H-Section Steel

QINGDAO GUSITE CONSTRUCTION ENGINEERING CO.,LTD
Contact Now

Prefab Portal Frame Steel Structure Building For Storage With H-Section Steel

Brand Name : GST

Model Number : Steel Structure Warehouse

Certification : ISO 9001, CE certificate of quality system

Place of Origin : CHINA

MOQ : 1000 sqm

Price : USD50 per sqm

Payment Terms : L/C, T/T

Supply Ability : 2000 tons per month

Delivery Time : 45days

Packaging Details : According to packing list

Structure form : Portal steel structure

Column & Beam : H section steel

Purlin : C/Z section steel

Surface Treatment : Painted or Hot Dip Galvanized

Standard : GB, ASTM

Application : steel workshop, steel fabricated house, steel structure warehouse, garage,storage

Contact Now

Prefab Portal Frame Steel Structure Building Prefabricated Storage With H-Section Steel

Project Description:

The steel structure warehouse is a building structure used for storing and protecting goods. It is typically made of steel, which provides high strength, durability, and stability.

Steel Structure warehouse is a kind of metal building warehouse, which is made of high-strength steel and offers excellent insulation and durability. It is designed with a portal structure and provides optional insulation so that it can meet the needs of the customers. The walls and roofs of the steel structure workshop are made of sandwich panel or color steel sheet, and the purlin is made of C-section or Z-section steel. As for the door, it can be a rolled up door or a sliding door.

Main steel fram H section steel beam and comlumns, painted or galvanized, galvanized C section or steel pipe
Secondary frame Galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc.
Roof panel Steel sheet or sandwich panel
Wall panel Sandwich Panel or Corrugated Steel Sheet
Tie Rod Circular Steel Tube
Brace Round Bar
Knee Brace Angle Steel
Roof Gutter Color Steel Sheet
Water downpipe PVC pipe
Door Aluminium alloy shutter door
Windows Aluminum alloy push-pull window
Packing According to the packing list

Product Image:

Prefab Portal Frame Steel Structure Building For Storage With H-Section Steel

Production capacity:

Our company can produce more than 30 kinds of series products with different structures and specifications. It has complete processing and manufacturing equipment and strong installation capabilities. It can supply a full set of materials required for steel structure construction projects, and provide all installation services and technical consultation.

We have 2 composite board production lines with an annual output of more than 1 million meters; 5 color steel plate production lines with an annual output of 2 million meters; 2 H-beam CNC production lines with an annual output of 20,000 tons; One C-beam production line with an annual output of 2,500 tons; One Z-beam steel productions line with an annual output of 2,000 tons.

In addition to various section-steel products, it can also manufacture color steel sheets, composite panels, lighting panels, ventilators, etc.

Prefab Portal Frame Steel Structure Building For Storage With H-Section Steel

Three main factors are affecting the cost of steel structure warehouse.

1. Raw Material

Steel and sheet are the main components of the warehouse, accounting for about 70%-80% of the total cost of the building. The fluctuation of the market price of steel structure raw materials directly affects the value of the building. The different section sizes, steel grade, thickness of the wall, and roof will cause the difference in price. So the raw materials are the main factor that affected the cost of steel workshop building.

2. Design Factor affected the cost of Steel Structure Warehouse

Design factor: Reasonable design can save raw materials and affect the cost of the steel structure warehouse. Different design plans are an essential factor for influencing the quantity of steel, directly affecting the total cost.

The foundation cost is closely related to the geology of the building. The construction period of the foundation accounts for about 25% of the total construction period. The foundation construction cost is 15% of the total cost of the metal building. When designing, we should pay attention to the geological report of the location of the building, choose a reasonable primary type, and control the base surface and depth of the foundation to play a decisive role in the total cost.

3. Construction factor

The construction time is also part of the cost. The proficiency of the installation technology is the primary factory for the construction period. The construction of the steel structure warehouse is a systematic project involving a wide range of factors and many influencing factors. The construction period, policy changes, and large amounts of engineering can all affect the cost of the workshop. Have an efficient and skilled installation team can save the owner a lot of time and expense!

Other Project Image:

Prefab Portal Frame Steel Structure Building For Storage With H-Section Steel


Product Tags:

Portal Frame Steel Structure Building

      

GB Prefab Steel Structure Building

      
Buy cheap Prefab Portal Frame Steel Structure Building For Storage With H-Section Steel product

Prefab Portal Frame Steel Structure Building For Storage With H-Section Steel Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: QINGDAO GUSITE CONSTRUCTION ENGINEERING CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)